Acitvities
-
Overall concept, evaluation and realisation
-
Installation of over 220 energy piles (load transfer) at 50 m depth, diameter 150 cm
-
Cooling and heat production in combination with block heating station, absorber refrigerator, hybrid cooler and gas boiler
Technical data
-
Heat capacity of 3.7 MW
-
Cooling capacity of 4.0 MW
Period
-
1996 - 2000
Location
-
Frankfurt, Germany